Project Information:
Delivery Date: 2024.04
What We Supplied:
Aluminium conductors Copper tape screen Type of insulation -XLPE insulation Type -1 x 185 RM/25 Voltage - 33 kV
Aluminium conductors Copper tape screen Type of insulation -XLPE insulation Type -1 x 240 RM/25 Voltage - 33 kV
Project News:
The development of the 33KV distribution business in Ethiopia is showing a positive trend. With the rapid economic growth of the country, the demand for electricity consumption is also showing a rapid increase, which directly drives the continuous expansion of the distribution business.
To meet the growing demand for electricity, the Ethiopian government is actively promoting the construction of renewable energy projects, especially the development of hydropower stations. In addition, wind and solar energy resources have also been fully developed and utilized. The construction of these renewable energy projects not only provides sufficient power resources for the power industry but also effectively alleviates the dependence on fossil energy while promoting environmental protection and sustainable development.
In terms of grid construction, Ethiopia is gradually improving the urban and rural power grids to enhance the stability and reliability of power supply. This not only helps to meet the current electricity demand but also lays a solid foundation for the future development of the power industry.
Specifically, regarding the 33KV distribution business, Ethiopia is actively introducing foreign capital and technology to promote its development. For example, some Chinese companies have already participated in multiple 33KV distribution projects in Ethiopia, providing advanced equipment and technical support to help improve the efficiency and reliability of the local distribution system.
Overall, the development prospects of the 33KV distribution business in Ethiopia are broad. With the support of government policies and the continuous expansion of the market, this sector will face more development opportunities and challenges.
Botswana Ramotswa 2 x 132/33kV 40MVA and 2 x 132/11kV 30MVA Substation Project - Power Cable Supply
Angola 400kV Power Transmission and Transformation Project - Bare Conductor and Earth Wire Supply
Sudan 220kV Babanusa-Adila Power Transmission Project - Power and Earthing Cable Supply
Malawi MV Distribution Line Hardware and Accessories Procurement - Cable and Conductor Supply
Angola RED Social Housing Project Kilamba Kiaxi Phase I - Electric and Power Cable Supply
Burundi MT Overhead Power Grid Project - Cables and Conductors Supply