Project Information:Project Name: Kharkhoriin 110/35/10 kV Substation ProjectOwner: Ministry of Energy (MoE)Financier: World BankDelivery Date: 2023.02What We Supplied:Control cable KVVP2/22 7x4мм2Control cable KVVP2/22 14x4мм2Control cable KVVP2/22 3x2.5мм2Control cable KVVP2/22 8x1.5мм2Control cab Read More
Project Information:Project Name: Telmen 110/10 kV Substation ProjectOwner: Ministry of Energy (MoE)Financier: World BankDelivery Date: 2023.02What We Supplied:10kV power cable XLPE CU 3x95мм20.4kV power cable XLPE CU 3x4+1x2.5мм20.4kV power cable XLPE CU 3х35+1х16мм20.4kV power cable XLPE CU 3x25+1 Read More
Project Information:Owner: National Grid Corporation of The Philippines (NGCP)Project Name: THE VISAYAS SUBTATION UPGRADING PROJECT 2, SCHEDULE VI - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONGING OF HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES AT TABANGO, ISABEL AND MAASIN SUBSTATION Read More
Project Information:Project Name: Design, Supply, Installation, Testing & Commissioning of Barishal 1MWp Grid Tied Solar Power Plant at Barishal, Bangladesh on Turn Key BasisOwner: Bangladesh Power Development Board(BPDB)Awarded Date: 2022.09What We Supplied:1CX4 Sq-mm Cable, BYA (Red Colour) (PV Mo Read More
Project Information:Project Name: Mongolia Altai 10MW Solar Power Plant PlantOwner: Ministry of Energy (MoE)Financier: Asian Development Bank (ADB)Delivery Date: 2022.09What We Supplied:DC Cable 1*240sq, 1500VDC, AL, Class2, halogen free, XLPESolar Cable 1*4sq, 1500VDC, CU, Class 5, halogen free, XL Read More
Project Information:Project Name: Vietnam Vinh Hao 220kV Substation and ConnectionOwner: Vietnam Electricity (EVN)Delivery Date: 2022.08What We Supplied:AACSR PHLOX 59.7 CONDUCTORAACSR 300/50 CONDUCTORProject News:Vinh Hao 220kV substation is invested and built in the unmanned model with two 220/110 Read More