Project Information:Project Name: Kharkhoriin 110/35/10 kV Substation ProjectOwner: Ministry of Energy (MoE)Financier: World BankDelivery Date: 2023.02What We Supplied:Control cable KVVP2/22 7x4мм2Control cable KVVP2/22 14x4мм2Control cable KVVP2/22 3x2.5мм2Control cable KVVP2/22 8x1.5мм2Control cab
Read MoreProject Information:Owner: National Grid Corporation of The Philippines (NGCP)Project Name: THE VISAYAS SUBTATION UPGRADING PROJECT 2, SCHEDULE VI - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONGING OF HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES AT TABANGO, ISABEL AND MAASIN SUBSTATION
Read MoreProject Information:Owner: National Grid Corporation of The Philippines (NGCP)Project Name: Abuyog Substation ProjectDelivery Date: 2022.05What We Supplied:3/8'' Ordinary grade, class c wireAnnealed Bare Copper Conductor-125 mm2, 19x2.68mmAnnealed Bare Copper Conductor-38 mm2, 19x1.60mmTinned Anneal
Read MoreProject Information:Project Name: Kenya Electricity Modernization ProjectDesign, Supply and Installation of 1175 kW AC ( 1410 kWp DC) Solar Photovoltaic Power Generation Plants with Associated Power Distribution Network (Mini-Grids) in Selected Un-electrified Locations in Lake Victoria Region (Lo
Read More