Views: 46 Author: Site Editor Publish Time: 2024-08-20 Origin: Site
Project Information:
Owner: Tanzania Electric Supply Company Limited(TANESCO)
Awarded Date: 2024.06
What We Supplied:
H07V-R 1x50mm2 (Green)
H07V-R 1x95mm2 (Green)
Annealed Bare Copper Conductor 50mm2
Annealed Bare Copper Conductor 125mm2
Annealed Bare Copper Conductor 120mm2
Annealed Bare Copper Conductor 95mm2
Annealed Bare Copper Conductor 35mm2
Yellow/Green Insulated Copper Wire-450/750V 35mm2
Yellow/Green Insulated Copper Wire-450/750V 16mm2
Yellow/Green Insulated Copper Wire-450/750V 2.5mm2
Yellow/Green Insulated Copper Wire-450/750V 1.5mm2
Project News:
TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.
TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line , 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo, 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro, 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line, 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line and 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line).
Other projects at which are at inception stages includes 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations, Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti, 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga, 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga, 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga, 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations and Construction of various TANESCO buildings including Regional and Districts offices.
Mozambiqe Material Procurement Project - Cables and Conductors Supply
Tanzania Substation Project - Earthing Cables and Conductors Supply
Mozambique 275kV Substation Project - Cables and Conductors Supply
South Sudan Petroleum Project - Cables and Conductors Supply
Ethiopia Private Corporation MV Power Distribution Project - Cables Supply
Ghana Electricity Distribution Panel Project - Cables Supply
Sierra Leone 11/0.4kV Overhead Distribution Project - Cables Supply