;
Views: 27 Author: Site Editor Publish Time: 2022-01-18 Origin: Site
Project Information:
Project Name: FOR THE PROVISION OF ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BLOCK 9 OFFGRID SOLAR POWER PROJECT FOR CAMP FACILITIES PHASE 1 & PHASE 2
Owner: Kuwait Energy (KEC)
Delivery Date: 2022.01
What We Supplied:
PV-F-1.8kV-1×4
MC4 Connector IP68
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*95
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*120
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*150
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*185
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*95
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*120
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*150
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*185
ZRC-YJV32(FRC CU/XLPE/CTS/PVC/SWA/PVC)-8.7/15kV-3*95
Termination Kits for ZRC-YJV32(FRC CU/XLPE/CTS/PVC/SWA/PVC)-8.7/15kV-3*95
ZRC-YJV32(FRC CU/XLPE/CTS/PVC/SWA/PVC)-8.7/15kV-3*70
Termination Kits for ZRC-YJV32(FRC CU/XLPE/CTS/PVC/SWA/PVC)-8.7/15kV-3*70
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*185
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*25
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*16
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*185
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*25
Termination Kits for ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*16
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-4*6
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-2*6
ZRC-YJV22(FRC CU/XLPE/PVC/STA/PVC)-0.6/1kV-3*4
CU/PVC(BVR)-0.6/1kV-1*2.5
R485 Shield Twisted Cable
OPGW GYTA53-4B1
Project News:
KUWAIT ENERGY PROVIDES AN UPDATE ON ITS IRAQ OPERATIONS
Following recent developments in the north of Iraq, Kuwait Energy today confirms that, despite logistical challenges due to the current situation, the Company’s operations in its Block-9 and the Siba Contract Areas in Iraq remain largely unaffected and continue on schedule.
In Siba, the appraisal well Siba-4 is at 3,700 meters out of total targeted depth of 4,200 meters and drilling is ongoing at the time of this statement. In parallel, civil work activities, pipeline construction and laydown, and receipt of long lead items are ongoing.
In Block-9, the drilling of the exploration well continues and is currently at 3,050 meters out of circa 4,500 meters targeted depth. The demining activities are picking up pace and continue unaffected at the time of this statement.
With regard to Mansuriya, the Consortium has arranged with Midland Oil Company to halt activities until the security situation in the vicinity improves. Meanwhile, the joint venture partners continue to discuss strategy with respect to the development of the Mansuriya Contract Area going forward.
We would like to re-assure shareholders that currently there is no immediate threat to any of the Company’s operations in the region. However, the safety of our workforce is our number one priority, and as such we, alongside our partners, continue to monitor the situation closely.
Mongolia Oyu Tolgoi Copper Mine - Control Cable and Power Cable Supply
Philippines Visayas Substation Upgrading Project - Earthing Conductors Supply
Vietnam Transmission Line Material Procurement - Conductors Supply
Myanmar 30MW Solar Power Plant Project - Conductors and Cables Supply
Myanmar 132kV Overhead Transmission Project - Conductors Supply
Vietnam 220kV Substation and Connection Project - Conductors Supply
Mongolia 110/35/10kV Substation Project - Control Cables Supply
Mongolia 110/10kV Substation Project - Power and Control Cables Supply