Project Information:
Project Name: Nauru 11kV Power Distribution Project
Owner: Nauru Utilities Corporation (NUC)
Awarded Date: 2022.12
Applicable Standard:
AS/NZS 1429.1
What We Supplied:
CABLE -1C 11 KV SINGLE CORE 630MM2 COPPER XLPE CABLES
CABLE -3C 11 KV THREE CORE 35MM2 COPPER XLPE CABLES
CABLE-SINGLE HEAVY DUTY SCREENED 95 SQMM COPPER 6.35/11KV
Project News:
After significant government reforms and infrastructure investment, 24-hour electricity has been available on the island since 2005; however there are still frequent power cuts. Nauru’s power supply was provided by diesel-powered generators maintained by the Nauru Phosphate Corporation, however, since its dismantling and government restructuring, the Nauru Utilities Authority (NAU) has taken over responsibility for the power supply. Nauru has struggled with energy conservation and cost-effectiveness, primarily due to extreme government subsidisation, but the installation of prepayment meters and increase in tariffs is meant to encourage conservation. The Ministry of Commerce, Industry and Resources is responsible for energy policy and is looking into the feasibility of alternative energy sources, including a pilot wind power project in Anabar sponsored by the Secretariat of the Pacific Regional Environment Programme.
Nauru 415V Overhead Power Distribution Project - LV Aerial Cables Supply
Fiji Utility Procurement Project - Binding and Stay Wires Supply
Nauru 11kV Power Distribution Project - MV Power Cables Supply
Papua New Guinea Stanley Hotel Project - MV Power Cables Supply
Nauru 33kV Power Line Upgrade Project - LV Power Cables Supply