;
Views: 5 Author: Site Editor Publish Time: 2022-03-24 Origin: Site
Project Information:
Project Name: Papua New Guinea Stanley Hotel
Delivery Date: 2022.03
Applicable Standard:
AS/NZS 1429.1
What We Supplied:
3C 185 mm2 PCW 6.35/11 kV XLP CWS PVC MV (5V-90) SWA PVC MV
3C 150 mm2 PCW 12.7/22 kV XLP CWS PVC MV
3C 185 mm2 PCW 12.7/22 kV XLP CWS PVC MV
Project News:
One of the largest hotel which attached to the largest shopping mall with 6x transformers, ring main units, switch gears, main switch board, and distribution board installed.