Project Information:
Owner: Emirates Sembcorp Water & Power Company (ESC)
Delivery Date: 2021.05
What We Supplied:
8.7/15 (17.5)kV CU/XLPE/LSF Cable 1x95 sq.mm Anti-Rodent/Termite
CU/XLPE/SWA/PVC-0.6/1kV-5x10mm2
CU/XLPE/SWA/PVC-0.6/1kV-5x16mm2
Project News:
Fujairah 1 Independent Water and Power Plant Expansion
Fujairah 1 Independent Water and Power Plant is a hybrid desalination plant incorporating multistage flash distillation (MSF) and reverse osmosis (RO) technologies.
The plant was expanded to increase the desalination capacity by a further 30 million imperial gallons per day (MIGD). The expanded plant began its operations in December 2015.
Desalinated water from the expansion phase is sold to the Abu Dhabi Water & Electricity Company (ADWEC) under a 20-year water purchase agreement, signed with the plant’s owner and operator Emirates Sembcorp Water & Power Company (ESC).
ESC is a joint venture formed by Sembcorp with a 40% stake, Abu Dhabi National Energy Company (TAQA) holding 54% and Abu Dhabi Water & Electricity Company (ADWEC), holding the remaining 6%. The joint venture partners invested approximately $200m on the expansion.
Expansion works commenced in June 2013 and were completed in December 2015. The project meets the increasing water needs of roughly 500,000 people in Abu Dhabi and the Northern Emirates.
Contractors for the expansion of Fujairah 1
The design and build contract for the project was awarded to a consortium comprising of ACCIONA Agua (75%) and ACCIONA Infrastructure (25%), which are two main business divisions of ACCIONA Group.
ACCIONA is also responsible for the maintenance of the plant for a period of seven years. ILF Consulting Engineers provided the consultancy and supervision services for the project.
Contractors for the expansion of Fujairah 1
The design and build contract for the project was awarded to a consortium comprising of ACCIONA Agua (75%) and ACCIONA Infrastructure (25%), which are two main business divisions of ACCIONA Group.
ACCIONA is also responsible for the maintenance of the plant for a period of seven years. ILF Consulting Engineers provided the consultancy and supervision services for the project.
Location and details of the existing water / power plant
Fujairah 1 Independent Water and Power Plant is located about 180km from Dubai, and 20km north of Fujairah, on the shore of Oman.
The plant came online in June 2004 under the ownership of UWEC (ADWEA). The ownership of the plant was transferred to Sembcorb in September 2006.
The combined cycle power plant has a power generation capacity of 882MW and the desalination plant has a water generation capacity of 100 MIGD. The desalination plant had the capacity to produce 62.5 MIGD of water using the (MSF) technology and 37.5 MIGD using RO technology, prior to the expansion.
The hybrid desalination plant is made up of five MSF desalination units of 12.5 MIGD each, supplied by Doosan, and an RO plant supplied by Degremont. The plant also comprises a potable water plant and five tanks with a storage capacity of 20MIG each.
Associated facilities for the plant include the intake structure station and the interface to the storage tanks. Water from the MSF units and the RO plant is conveyed to the potable water plant and water tanks via a single pipeline.
Expansion of the UAE’s seawater desalination plant
The expansion increased the current RO treatment capacity of the plant from 100 MIGD to 130 MIGD.
The expansion made the plant one of the largest RO desalination plants in the Middle East.
The project also included the installation of a new dissolved air floatation (DAF) system, which improves the quality of the seawater feed.
The project enables the desalination plant to utilise the surplus uncontracted power from the combined cycle power plant, enhancing the plant’s income and providing an option to produce water at a competitive cost.
Reverse osmosis technology for Fujairah 1’s expansion
ACCIONA Agua applied the RO technology for the expansion project.
The plant initially uses the dissolved air floatation (DAF) system for pre-treatment to remove the solid particles from the water. The RO technology is then implemented, which makes use of a semipermeable membrane to remove the salt content and other effluent materials from the water molecules.
Malaysia Power Grid Project - Semi-Finished Conductors Supply
Philippines 69kV and 230kV Substation Project - Earthing Cables and Conductors Supply
Sri Lanka Private Factory Construction Project - Cables Supply
Mongolia Oyu Tolgoi Copper Mine - Control Cables and Power Cables Supply
Vietnam Transmission Line Material Procurement - Conductors Supply
Guam Materials Procurement Project - Cables and Conductor Supply
Philippines Visayas Substation Upgrading Project - Earthing Conductors Supply
Mongolia 110/35/10kV Substation Project - Control Cables Supply
Mongolia 110/10kV Substation Project - Power and Control Cables Supply
Myanmar 132kV Overhead Transmission Project - Conductors Supply